Claude Code Todo List: 10 Task Briefs for Real Coding Work

    Guides•
    By TODO Team
    •
    •
    8 min read

    Updated 6 November 2026 · By Dan, founder

    Short answer: Claude Code can use an external todo list as a persistent coding work queue through MCP. The important part is the brief: give each task a clear goal, repository context, inputs, limits, timeline and definition of done, then have Claude Code read the full notes before it starts and log what actually happened when it stops.

    • Keep the title human and short. Put execution detail in the notes.
    • Say which repository, branch or files matter, and what Claude Code must not change.
    • Include the checks that prove the work is finished.
    • Use TODO’s result log to preserve changes, test outcomes and blockers for the next session.

    Why a Three-Word Coding Task Is Not Enough

    Fix checkout bug is a useful reminder for you. It is not a safe brief for an agent. Which checkout? What went wrong? Which repository? Should it change code or only investigate? Is a successful test enough, or does the fix need a particular browser check?

    A better title might be Stop duplicate checkout submissions. The notes can then carry the reproduction steps, affected route, expected behaviour and checks. You still get a list you can scan on your phone, while Claude Code gets enough information to make a sensible start.

    Feature Weak brief Execution-ready version
    Goal Fix checkout Prevent duplicate orders when the Pay button is pressed twice
    Context Not stated Repository, branch, failing route and reproduction steps
    Boundaries Not stated Do not change the payment provider or pricing logic
    Done when Not stated Regression test passes and one press creates one pending order
    Result Finished Changed files, checks run, remaining risks and next step

    The Reusable Claude Code Task Template

    Copy this shape into a TODO task’s notes. Delete fields that genuinely do not apply, but do not leave Claude Code to guess the goal or completion criteria.

    Title: A short outcome you can scan in a list

    Context: Why the work matters and where it belongs.
    Steps: The expected sequence, or investigate first if the cause is unknown.
    Inputs: Repository, branch, files, screenshots, logs, links and people involved.
    Limits: What not to change; actions that need approval.
    Done when: Observable behaviour plus the checks that must pass.
    Timeline: When you need it, and whether it blocks other work.

    TODO also tells assistants to check five things before execution: steps, platforms or tools, people, goal and timeline. If anything important is unclear, the assistant should inspect what it can access and ask you before acting. A task with no notes is never treated as execution-ready on its own.

    10 Copyable Task Briefs for Claude Code

    These are illustrative briefs, not claims about work performed in your repository. Replace the example routes, file names and checks with your own.

    1. Reproduce and fix a bug

    Title: Stop duplicate checkout submissions
    Context: In the shop repository, two rapid clicks on Pay create two pending orders. Use the current develop branch.
    Steps: Reproduce the issue, find the shared cause, add the smallest fix and a regression test.
    Limits: Do not change prices or payment-provider settings.
    Done when: The new test fails before the fix and passes after it; the existing checkout tests still pass.
    Timeline: Ready for review by Thursday.

    2. Add a small feature behind a flag

    Title: Add an optional compact task view
    Context: Desktop users want denser lists. Use the web repository and existing feature-flag pattern.
    Steps: Add a disabled-by-default flag, implement the compact spacing and cover both states.
    Limits: Do not change mobile layout or stored task data.
    Done when: Both view tests pass and the default interface is unchanged.
    Timeline: This week; no release without my approval.

    3. Repair a failing test

    Title: Fix the flaky weekly rollover test
    Context: The test fails around midnight in CI. Logs are attached to this task.
    Steps: Reproduce the time dependency, inject a fixed clock and remove real-time dependence.
    Limits: Do not change production rollover rules to make the test pass.
    Done when: The test passes repeatedly across two simulated dates and the rollover behaviour is unchanged.
    Timeline: Before the next release.

    4. Make a bounded refactor

    Title: Extract the repeated date formatter
    Context: Three components duplicate the same date formatting logic.
    Steps: Add one shared formatter, migrate those three components and run their tests.
    Limits: No visual changes and no broader cleanup.
    Done when: All three imports use the helper, existing tests pass and the rendered dates remain identical.
    Timeline: Low priority; stop if the change reaches other modules.

    5. Update a dependency safely

    Title: Update the date library one minor version
    Context: We need the latest timezone fix. The current lockfile and CI workflow are in the repository.
    Steps: Read the release notes, update only that package and address documented breaking changes.
    Limits: Do not update unrelated packages or rewrite the date layer.
    Done when: Install, typecheck and date-related tests pass; summarise any remaining deprecation warnings.
    Timeline: This sprint.

    6. Investigate a performance regression

    Title: Investigate slow list opening
    Context: Opening a 200-task list feels slower since last week. Start with the list-rendering component and recent changes.
    Steps: Measure first, identify the main cause and report a recommended fix before editing.
    Limits: Investigation only until I approve the proposed change.
    Done when: You provide before measurements, the likely cause and a bounded fix proposal.
    Timeline: Findings by Friday.

    7. Fix one accessibility problem

    Title: Make the task dialog usable by keyboard
    Context: Keyboard focus can escape the open edit dialog on desktop.
    Steps: Reproduce with keyboard only, contain focus while open and restore it to the trigger on close.
    Limits: Do not redesign the dialog or change its copy.
    Done when: Tab and Shift+Tab stay inside, Escape closes it and focus returns to the trigger; add a regression test.
    Timeline: Next accessibility pass.

    8. Document an existing workflow

    Title: Document the local test workflow
    Context: New contributors cannot tell which checks to run before opening a pull request.
    Steps: Read the existing scripts and CI configuration, then add a concise section to the contributor guide.
    Limits: Document current behaviour only; do not change scripts or CI.
    Done when: A new contributor can find install, unit-test and pre-review commands in one place.
    Timeline: Before Monday’s onboarding.

    9. Review a pull request without editing it

    Title: Review the recurrence pull request
    Context: Pull request 184 changes repeating-task completion dates. The product rule is in the attached note.
    Steps: Read the diff and tests, trace the date boundary cases and report concrete findings with file references.
    Limits: Review only. Do not push commits or approve the pull request.
    Done when: Findings are ordered by impact, or you explicitly report no findings and name the residual test gaps.
    Timeline: Today.

    10. Resume work from a previous session

    Title: Finish the saved search pagination
    Context: The previous session added the server query but not the next-page control. Its result is logged on this task.
    Steps: Read that result and the current diff, verify what exists, then finish only the remaining control and tests.
    Limits: Do not redo the server query unless a test shows it is wrong.
    Done when: The next page loads without duplicates, the control has a test and all search tests pass.
    Timeline: Continue when I start the next Claude Code session.

    How to Hand the List to Claude Code

    1. Connect TODO using the command on the MCP setup page. The detailed walkthrough is in how to use TODO with Claude Code and Cowork.
    2. Put the briefs in Today, a named project list or the weekly pad, depending on how you plan.
    3. Ask: "Read today’s TODO tasks and identify the ones for this repository. Retrieve each full task detail, then show me which are ready and which need clarification. Do not start yet."
    4. Approve a specific task: "Work on Stop duplicate checkout submissions only. Follow its limits, run the stated checks and log the result in TODO."
    5. Review the code and the result log before treating the work as merged or released.

    TODO supplies the task and its history. Claude Code’s own tools and permission settings determine what it may read, write or execute. Anthropic documents those controls in its Claude Code permissions guide. Connecting MCP does not remove those boundaries or grant unrestricted permission.

    What Claude Code Should Do When a Brief Is Incomplete

    Finding a repository or connector that looks relevant is not permission to begin. Claude Code should identify the missing goal, inputs, people, platform or timeline, search the material it can access, and then ask a small set of specific questions.

    For example: "I found two checkout routes. Which one shows the duplicate-order issue, and may I change the submit handler?" Once you answer, TODO can save that context on the task so the next session does not need to ask again.

    What a Useful Result Log Looks Like

    A green tick alone does not tell you much. Ask Claude Code to record four things:

    • Changed: files or systems touched, with a useful link where one exists.
    • Checked: tests and manual checks actually run, including their outcomes.
    • Not done: anything skipped, blocked or left outside the brief.
    • Next: the remaining action and who owns it.

    That turns the todo item into a durable handover. You can leave a session, open TODO on your phone later and see both the state of the work and the reason it is or is not complete.

    Connect TODO to Claude Code

    For everyday capture and planning rather than coding, read how to manage your todo list with Claude.

    Related: TODO MCP server reference · a todo app for humans and AI agents · use TODO with Codex

    Frequently Asked Questions

    Can Claude Code use an external todo list?

    Yes. Claude Code can connect to TODO’s remote MCP server, read tasks and notes, add or update work, log results and complete tasks when the work is genuinely finished.

    What should a Claude Code task brief include?

    Include the goal, context, ordered steps or investigation plan, repository and file inputs, people involved, limits, approval boundaries, timeline and observable definition of done. Include the checks that must pass.

    Should Claude Code start from a task title alone?

    No. TODO instructs assistants that a task without notes is never execution-ready on its own. Claude Code should retrieve the full detail, inspect available context and ask for missing information before acting.

    Does connecting TODO give Claude Code unrestricted access?

    No. TODO provides task tools after OAuth approval, while Claude Code’s own environment and permission settings control repository, terminal and other actions. Connecting MCP does not bypass those controls.

    Why log results back onto the task?

    A result log preserves changed files, checks, blockers and next steps outside the chat. That makes work easier to review and lets a later Claude Code session resume without reconstructing the whole history.

    Related Articles